TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 415 of 796

RIGGING 10-TON SNATCH BLOCK - Continued
WARNING
Wire ropes can become entangled, frayed, or contain broken wires. Wear heavy leather-
palmed gloves when handling wire rope. Do not allow moving wire rope to slide through
hands, even when wearing gloves. Failure to comply may result in personnel injury.
4.
Have operator payout hoist cable (WP 0079), pass hoist cable (Figure 2, Item 3) over top of crew
compartment, and under boom crossmembers (Figure 2, Item 2). Keep hoist cable between staylines
(Figure 2, Item 1).
5.
Pass hoist cable (Figure 2, Item 3) up and over left side of boom travel lock support (Figure 2, Item 4).
6.
Bring hoist cable (Figure 2, Item 3) back, going up and over left boom pulley (Figure 2, Item 6).
7.
Lay cable (Figure 2, Item 3) in 10-ton snatch block pulley (Figure 2, Item 8) and lower hinge
(Figure 2, Item 9).
8.
Pull hook (Figure 2, Item 10) down to lock hinge (Figure 2, Item 9).
9.
Close boom pulley safety latch (Figure 2, Item 7) and connect hoist cable (Figure 2, Item 3) end to boom
dead man (Figure 2, Item 5).
Figure 2.
Rigging 10-Ton Snatch Block.
END OF TASK
TM 9-2350-256-10
0076
0076-3


Back to Top