TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 416 of 796

RIGGING 25-TON SNATCH BLOCK
WARNING
Ensure proper lifting techniques are followed when removing or installing heavy
components. Refer to table, Maximum Lifting Capacity for Personnel (WP 0102),
for guidance when lifting and carrying objects. Use assistant(s) and/or suitable
lifting device when lifting heavy parts of components. Failure to comply may result
in personnel death, injury, and/or damage to equipment.
Do not use 25-ton (22.7-metric ton) snatch block if screw is not installed. If there is
no hole in hinge for screw, immediately notify maintenance for installation. Failure
to secure clevis to hinge with screw could result in release of snatch block during
lifting operations possibly resulting in personnel death or injury.
CAUTION
In order not to tangle cable when rigging, read following instructions carefully. Failure to
comply may result in damage to equipment.
1.
Place 25-ton (22.7-metric ton) snatch block (Figure 3, Item 1) in boom tray (Figure 3, Item 3) with clevis
(Figure 3, Item 6) forward.
2.
Remove screw (Figure 3, Item 4) from snatch block (Figure 3, Item 1), swing clevis (Figure 3, Item 6), and
lift hinge (Figure 3, Item 5).
3.
Open boom pulley safety latch (Figure 3, Item 2).
Figure 3.
25-Ton Snatch Block.
TM 9-2350-256-10
0076
0076-4


Back to Top