TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 418 of 796

RIGGING 25-TON SNATCH BLOCK - Continued
11.
Bring cable (Figure 6, Item 1) forward and lay it in upper pulley (Figure 6, Item 2) of block from left to right.
12.
Pull cable (Figure 6, Item 1) toward boom pulley (Figure 6, Item 3) and secure it to dead man
(Figure 6, Item 4).
WARNING
Do not use 25-ton (22.7-metric ton) snatch block if screw is not installed. If there is no hole
in hinge for screw, immediately notify maintenance for installation. Failure to secure clevis
to hinge with screw could result in release of snatch block during lifting operations possibly
causing death.
13.
Close snatch block (Figure 6, Item 5). Replace and tighten screw (Figure 6, Item 6).
14.
Close hoist winch cable access door (WP 0034).
Figure 6.
25-Ton Snatch Block.
END OF TASK
END OF WORK PACKAGE
TM 9-2350-256-10
0076
0076-6


Back to Top