TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 423 of 796

BOOM OPERATION
INITIAL SETUP:
Tools and Special Tools
General mechanic's tool kit
(WP 0135, Table 1, Item 2)
Materials/Parts
Leather gloves (WP 0133, Table 1)
Personnel Required
Crewman (3)
References
DA PAM 40-501 (WP 0131)
References (cont.)
Hoist winch cable access door operation
(WP 0034)
Hoist winch operation (WP 0079)
Prepare auxiliary hydraulic system for operation
(WP 0074)
Prepare main hydraulic system for operation
(WP 0073)
Equipment Condition
Vehicle parked on level surface
Main engine shut down (WP 0017)
WARNING
During any winching, hoisting, lifting, or boom raising operation, hatches must be
closed for operator and crew safety. Failure to comply may result in personnel
death or injury.
At no time during M88A1 boom operations are personnel required to be positioned
on the engine deck of vehicle. The A shape of boom support hatch is designed to
guide hoist winch cable out of the path of retracting boom. Failure to comply may
result in personnel death, injury, and/or damage to equipment.
GENERAL
The boom is powered by the main hydraulic system under normal conditions. In an emergency, the boom may be
raised or lowered under no-load conditions using the auxiliary hydraulic system. The boom controls are in the
operator area.
TM 9-2350-256-10
0078
0078-1


Back to Top