TM 9-2350-260-20-1-2
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
6-60
Inspection
6-61
Installation
6-62
TOOLS:
1/2 in. socket with 1/2 in. drive
Flat-tip screwdriver
Ratchet with 1/2 in. drive
5/16 in. combination box and open end wrench
SUPPLIES:
Hose (3 required)
Gasket (8682772)
Lockwasher (7410218) (2 required)
SPECIAL TOOLS: Ground hop kit (Item 30 Chapter 3, Section I)
REFERENCE: LO 9-2350260-12
PRELIMINARY PROCEDURES:
Remove powerplant
(page 51)
Drain engine oil
(2A engine, page 647)
(2D engine, page 6-49)
REMOVAL:
1.
Using socket, remove two bolts (A) and two
lockwashers (B).
Throw lockwashers away.
2.
Remove gasket (C).
3.
Throw gasket away.
Go on to Sheet 2
TA147514
6-60