TM 9-2350-260-20-1-2
ENGINE OIL COOLER FLUID PUMP CONNECTOR REPLACEMENT (2D ENGINE) (Sheet 3 of 4)
10.
Remove and throw away gasket (K) under
connector (G).
CLEANING AND INSPECTION:
1.
Using dry cleaning solvent (Item 54, Appendix D),
clean hose (E) and connector (G).
2.
Replace connector (G) if cracked or broken.
3.
Inspect threads on home (E) and connector (G).
Replace as required.
4.
Replace hose (E) if woven shielding is worn or
broken.
INSTALLATION:
1.
Position new gasket (A) on oil cooler (B).
2.
Position connector (C) over gasket (A).
3.
Using 1/2 inch wrench, install three new self-
locking nuts ).
4.
Using 1-1/2 inch wrench, install hose (E) to
connector (C).
Go on to Sheet 4
TA147605
6-156