TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 241 of 772

TM 9-2350-260-20-1-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (LEFT AND RIGHT) TEST AND
REPLACEMENT (2A ENGINE) (Sheet 3 of 3)
4.
Place valve in boiling water.
Let free end of wire hang over edge of container.
5.
After about 30 seconds, use free end of wire to take valve out of water.
6.
Using ruler, measure overall length of valve.
Record length.
7.
Compare length of valve before and after heating.
If valve length increased less than 1/4 inch, throw valve away.
Get new valve and repeat test.
If new valve passes test, install it.
WARNING
Compressed air used for cleaning purposes will not exceed 30 psi.
Use only with
effective chip guarding and personal protective equipment (goggles/shield, gloves,
etc.).
8.
Using low-pressure compressed air, dry good valve.
INSTALLATION:
1.
Install new spacer ring (A) on valve assembly (B).
2.
Using hands, install valve assembly (B) in oil
cooler (C).
3.
Using 1-3/4 inch wrench, tighten valve (B).
4.
Start and run engine (TM 9-2350-260-10).
Check
for oil leaks.
5.
Install top deck (page 16-22).
End of Task
TA147613
6-164


Back to Top