TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 246 of 772

TM 9-2350-260-20-1-2
THERMOSTATIC TRANSMISSION OIL COOLER VALVE ASSEMBLY (RIGHT SIDE) TEST AND REPLACEMENT (2D
ENGINE) (Sheet 5 of 7)
4.
Place valve in boiling water.
Let free end of wire hang over edge of container.
5.
After about 30 seconds, use free end of wire to take valve out of water.
6.
Using ruler, measure overall length of valve.
Record length.
7.
Compare length of valve before and after heating.
If valve length increased less than 1/4 inch, throw valve away.
Obtain new valve and repeat test.
If new valve passes test, install it.
WARNING
Compressed air used for cleaning purposes will not exceed 30 psi.
Use only with
effective chip guarding and personal protective equipment (goggles/shield, gloves,
etc.).
8.
Using low-pressure compressed air, dry god valve.
INSTALLATION:
1.
Install new spacer ring (A) on valve (B).
2.
Using hands, install valve (B) to transmission oil
cooler.
3.
Using automotive wrench, tighten valve ().
4.
Using 1-5/8 inch wrench, install inside adapter (C).
5.
Using hands, install tube end fitting (D) on adapter
(C).
6.
Go to other end of tube (E).
Go on to Sheet 6
TA147617
6-169


Back to Top