TM 9-2350-260-20-1-3
T142 TRACK LINK REPLACEMENT (Sheet 2 of 3)
REMOVAL:
1.
Using 15/16 inch socket, loosen end connector bolt
(A) approximately 1/4 inch on both sides of bad link
(B).
2.
Using hammer, hit bolts (A) to loosen wedges (C).
3.
Remove bolts and wedges at both sides of track link
(B).
Throw bolts and wedges away.
4.
Using puller tool or hydraulic end connector puller (if
available), (Item 8, Chapter 3, Section I) remove end
connectors (D) from both sides of link (B).
Throw
end connectors away.
5.
Using 1-5/16 inch socket, T-slide handle, and
extension, loosen nut (E).
6.
Remove nut (E) and centerguide (F).
Throw nut and
centerguide away.
7.
Using hammer, tap bolt (G) loose.
8.
Remove bolt (G) and cap (H).
Throw bolt and cap
away.
9.
Remove link assembly from track.
Throw link assembly away.
Go on to Sheet 3
TA147894
14-93