TM-9-2350-261-20-2

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 2 OF 4

  TM-9-2350-261-20-2 - Page 269 of 1008

TM 9-2350-261-20-2
REPLACE DISTRIBUTION BOX ASSEMBLY FOR 200 AMP GENERATOR
SYSTEM (M577A2 AND M1068 ONLY)
0266 00
THIS WORK PACKAGE COVERS:
Removal (page 0266 00-1).
Installation (page 0266 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Materials/Parts
Sealing compound (WP 0782 00, Item 66)
Gasket
Grommet (9)
Lockwasher (5)
Lockwasher (5)
Personnel Required
Unit Mechanic
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground lead disconnected (WP 0294 00)
Master switch panel assembly removed (WP 0224 00)
REMOVAL
1.
Remove screw (1), lockwasher (2), and circuit 415 lead (3) from bus bar (4). Remove circuit 415 lead and grommet (5)
from distribution box (6). Discard grommet and lockwasher.
2.
Remove screw (7), lockwasher (8), circuit 6 lead (9), and circuit 49 lead (10) from bus bar (4). Remove circuit 6 lead,
circuit 49 lead, and two grommets (11) and (12) from distribution box (6). Discard grommets and lockwasher.
3.
Remove screw (13), lockwasher (14), circuit 10, 14, 15, and 27E lead (15), and circuit 450A lead (16) from bus bar (4).
Remove circuit 10, 14, 15, and 27E lead and grommet (17) from distribution box (6). Discard grommet and lockwasher.
4.
Remove screw (18), lockwasher (19), and wiring harness (20) from bus bar (4). Discard lockwasher.
026600-1


Back to Top