TM 9-2350-261-20-3
REPLACE MISSILE RACK (M901A1 ONLY) — Continued
0548 00
REMOVAL
1.
Remove six cotter pins (1), headed straight pins (2), and 12 shim washers (3) from rack assembly. Discard cotter pins.
2.
Remove upper rack (4) and middle rack (5) from carrier.
3.
Remove 24 flanged bushings (6), if required, and remove 12 screws (7), lockwashers (8), washers (9), six clevises
(10), and shims (11) from carrier. Discard lockwashers.
4.
Remove two nuts (12), washers (13), screws (14), washers (15), and shims (16) from lower rack (17). Remove lower
rack from carrier.
5.
Remove two screws (18), if required, and remove two screws (19), washers (20), lockwashers (21), and brackets (22)
from carrier. Discard lockwashers.
0548 00-2