TM-9-2350-261-20-3

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 3 OF 4

  TM-9-2350-261-20-3 - Page 535 of 932

TM 9-2350-261-20-3
REPLACE RAMP LINKAGE (M1064 ONLY)
0560 00
THIS WORK PACKAGE COVERS:
Removal (page 0560 00-1).
Clean, Inspect, and Repair (page 0560 00-3).
Installation (page 0560 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0780 00, Item 29)
Materials/Parts
C otter pin (
4
)
K ey washer (
4
)
Locknut
Lockwasher (2)
Square washer
Personnel Required
Unit Mechanic
References
WP 0559 00
Equipment Condition
Engine stopped (see your -10)
Ramp lowered (see your -10)
On right side only, mortar ammunition racks removed
(WP 0507 00)
REMOVAL
NOTE
Removal and installation of ramp linkage are the same for both sides of carrier. Text is for
onesideonly
.
1.
Remove cotter pin (1), headed pin (2), and connecting link (3) from arm (4). Discard cotter pin.
2.
Remove cotter pin (5), headed pin (6), and connecting link (3) from clevis (7). Discard cotter pin.
3.
Loosen locknut (8). Remove clevis (7) and locknut from rod (9). Discard locknut.
056000-1


Back to Top