TM-9-2350-261-20-3

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 3 OF 4

  TM-9-2350-261-20-3 - Page 525 of 932

TM 9-2350-261-20-3
REPLACE RAMP LINKAGE (M113A2, M901A1, AND M1059 ONLY) — Continued
0558 00
6.
Install clevis (1) on flat shaped rod (2) or clevis (3) on left hand threaded end of hex shaped rod (4).
7.
Align connecting link (5) with clevis (1) or (3). Secure with headed pin (6) and new cotter pin (7).
8.
Align connecting link (5) with arm (8). Secure with headed pin (9) and new cotter pin (10).
WARNING
Falling ramp could cause severe injuries. Keep personnel clear of ramp area.
9.
Adjust ramp lock (WP 0556 00).
FOLLOW-THROUGH STEPS
1.
Raise and lock ramp to check that ramp linkage works right (see your -10).
2.
Stop engine (see your -10).
END OF TASK
0558 00-5/6 blank


Back to Top