TM-9-2350-261-20-3

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL - VOLUME 3 OF 4

  TM-9-2350-261-20-3 - Page 538 of 932

REPLACE RAMP LINKAGE (M1064 ONLY) — Continued
3.
Place cross-shaft arm (6) on rear bulkhead. Secure with two support blocks (7), four new key washers (8), and screws
(9). Bend keys to secure screws.
4.
Install pin (10) in latch (11).
5.
Align spring (12), latch (11), and two washers (13) with arm (6). Secure with headed pin (14) and new cotter pin (15).
6.
Install three bumpers (16) on rod (17).
7.
Install rod (17) and three bumpers (16) in carrier.
8.
Install clevis (21) on rod (17).
9.
Align clevis (21) with arm (6). Secure with headed pin (22) and new cotter pin (23).
10. Install new locknut (24) and clevis (25) on rod (17). Do not tighten locknut.
11. Align connecting link (26) with clevis (25). Secure with headed pin (27) and new cotter pin (28).
12. Align connecting link (26) with arm (29). Secure with headed pin (30).
13. Adjust ramp lock ().
14. Tighten screws (5) and locknut (24).
15. Install new cotter pin (31).
0560 00-4
0560 00
TM 9-2350-261-20-3


Back to Top