INSTALL PERSONNEL HEATER KIT (M113A2 AND M1059 ONLY) — Continued
40. Apply a thin, even coat of primer and then sealing compound to cleaned external pipe threads of fittings. Do not apply
primer or sealing compound beyond small end of threads.
41. Secure elbow (1) to power plant bulkhead with two locknuts (2).
42. Install nut (10) and sleeve (11) onto tube (3).
43. Secure tube (3) to adapter body (4) with sleeve (5) and nut (6).
44. Secure tube (3) to weldnut (7) with clamp (8) and screw (9).
45. Drill two holes in bulkhead to mount bracket (1).
46. Install fuel filter bracket (1) in hull. Secure with two screws (2), washers (3), and lockwashers (4).
47. Install fuel filter (5) in bracket (1), with port
4
facing hull. Secure with two screws (6), washers (7), and new locknuts (8).
005500-9
0055 00
TM 9-2350-261-34