TM 9-2350-277-20-3
INSTALLATION
1.
Install harness lead (16) through hole in top of distribution box (12). Secure harness lead and circuit 450A lead (15) to
bus bar (17) with new lockwasher (14) and screw (13).
2.
Install master switch panel (11) on distribution box (12). Secure with eight screws (10), washers (9), and new locknuts
(8).
3.
Connect circuit 27E lead (5) to battery generator gage (6).
4.
Connect circuit 10 lead (3) to instrument panel circuit breaker (4).
5.
Connect circuit 15 lead (1) to panel wiring harness (2).
0289 00-4
Change 2
REPLACE INSTRUMENT PANEL BATTERY-GENERATOR GAUGE WIRING HARNESS
—Continued
0289 00