REPLACE T150 TRACK — Continued
9.
Join track (see your -10).
10. TIGHTEN ALL END CONNECTOR BOLTS (1) TO 400-430 LB-FT (543-583 N·M) TORQUE.
11. Adjust track tension (see your -10).
FOLLOW-THROUGH STEPS
1.
Unblock vehicle (see your -10).
2.
Inst all track cover (
WP 0438 00
).
3.
Road test vehicle to check that track is installed correctly (see your -10).
4.
All n ew installed T 150 track sh oes require re
-
torqu ing b etween 3 0 and 80 m iles of operatio n. EN D C ONN ECTOR
BOLTS NEED TO BE RE-TORQUED TO 400-430 LB-FT (543-583 N·M) TORQUE.
END OF TASK
TM 9-2350-277-20-4
0422 01
0422 01-4
Change 4