REPLACE T150 TRACK SHOE PAD — Continued
INSTALLATION
1.
Install stud (4) of track shoe pad (1) through track shoe (2) from under track and install new locknut (3) on stud.
2.
TIGHTEN LOCKNUT (3) TO 120-150 LB-FT (162-203 N·M) TORQUE.
FOLLOW-THROUGH STEPS
1.
Unblock vehicle (see your -10).
2.
Road test vehicle to check that track shoe pad is installed correctly (see your -10).
END OF TASK
0424 01-2
Change 4
0424 01
TM 9-2350-277-20-4