TM 9-2350-311-20-1
CONTINUED FROM STEP C
D
1, Reconnect lead 27 to TRANSMISSION OIL
PRESSURE gage,
2. Disconnect battery ground leads.
3. Disconnect portable instrument panel wiring
harness from portable instrument panel
disconnect.
4. Place a jumper wire from socket P (lead
459B) to socket C (lead 459).
5. Place red lead of multimeters in socket A (lead
27) and black lead to ground.
6. Reconnect battery ground leads.
7. Turn MASTER switch ON and check for
voltage.
8. Turn MASTER switch OFF.
Is voltage present?
Repair or replace lead 27 of portable
instrument panel wiring harness from
TRANSMISSION OIL PRESSURE gage
(para 8-57)
1. Reconnect portable instrument panel
E
wiring harness to portable instrument panel
bracket.
2. Disconnect lead 27 from circuit breaker
output.
3. Place red lead of multimeters in circuit
breaker output and black lead to ground.
4. Turn MASTER switch ON and check for
voltage.
5. Turn MASTER switch OFF.
Is voltage present?
Repair or replace lead 27 of bulkhead-
to-portable instrument panel wiring
harness (para 8-57).
CONTINUED ON NEXT PAGE
3-213