TM 9-2350-311-20-1
CONTINUED FROM STEP B
I
1. Disconnect lead 50A from slave start
receptacle.
2. Place red lead of multimeter on lead 50A and
black lead to ground.
3. Check for continuity.
Is continuity present?
I
I
I
ground lead (para 8-55).
Replace slave start receptacle
D
1. Disconnect slave start cable from slave start
2.
3.
4.
5.
6.
7.
receptacle of vehicle being slaved.
Reconnect lead 50A to slave start receptacle.
Disconnect NATO slave start-to-external
power wiring harness from driver’s bulkhead.
Reconnect slave start cable to vehicle being
slaved.
Place red lead of multimeter on pin B (lead
49A) and black lead on pin E (lead 50A).
Turn MASTER switch to SLAVE and check
for voltage.
Turn MASTER switch OFF.
I
Is voltage present?
I
1
Repair or replace leads 49A and 50A
of NATO slave start-to-external power
wiring harness (para 8-63).
,
CONTINUED ON NEXT PAGE
3-359