TM 9–2350–311–20–2
Change 2
5–43
5–17 BUFFER ASSEMBLY
This task covers:
Inspection
INITIAL SETUP
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Fabricated bracket (Figure E–2, Appx E)
5-ton wrecker
Spacer (Figure E–3, Appx E)
Materials/Parts
Cotter pin (item 41, Appx G)
Personnel Required
2
Inspection
WARNING
•
When working on mount and cannon breech components, with cannon assembly pushed out of
battery, block cannon breech with suitable blocking, or chain tube to hull to prevent accidental
elevation of cannon assembly and injury to personnel or damage to equipment.
•
Operators should be in both vehicles while cannon tube is being pushed out of battery. Brakes in
both vehicles must be fully applied during this operation to prevent injury to personnel and avoid
damage to vehicles.
NOTE
Set breechblock mechanism in closed position before beginning procedure.
1
Position howitzer (1) and 5-ton wrecker (2) on level ground.
2
Set cannon tube (3) to zero elevation (TM 9–2350–311–10).
2
1
3