TM 9–2350–311–20–2
8–24
8–4
CAB POWER LEAD ASSEMBLY
This task covers:
a.
Removal
b.
Disassembly/Assembly
c.
Testing
d.
Installation
INITIAL SETUP
Test Equipment
Multimeter (item 6, Appx H)
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Materials/Parts
Lockwashers (22) (item 86, Appx G)
Self-locking nuts (3) (item 184, Appx G)
Tape, black (electrical) (item 39, Appx D)
Equipment Condition
Disconnect batteries (TM 9–2350–311–10)
141
142
143
L1
L2
100
WIRE 100
WIRE 100
WIRE 100
WIRE 100
WIRE 100
WIRE 100
NBC CONTROL BOX
(M109A4/M109A5)
WIRE 100
POWER RELAY
BOX ASSEMBLY
GUNNER’S SELECTOR
SWITCH BOX ASSEMBLY
CONTACT
ARM
ASSEMBLY