TM 9–2350–311–20–2
8–16
8–3
PANORAMIC TELESCOPE TO DOME LIGHT LEAD ASSEMBLY
This task covers:
a.
Removal
b.
Disassembly
c.
Testing
d.
Assembly
e.
Installation
INITIAL SETUP
Test Equipment
Multimeter (item 6, Appx H)
Tools
Artillery and turret mechanic’s tool kit
(SC 5180–95–CL–A12)
Materials/Parts
Lockwashers (12) (item 86, Appx G)
Self-locking nuts (3) (item 184, Appx G)
Tape, black (electrical) (item 39, Appx D)
Equipment Condition
Disconnect batteries (TM 9–2350–311–10)
POWER
RELAY BOX
DOME LIGHT ASSEMBLY
GUNNER’S SELECTOR
SWITCH BOX ASSEMBLY
DOME LIGHT
ASSEMBLY
138
138
147A
147C
147B
M117/M117A2
PANORAMIC
TELESCOPE