TM 9–2350–311–20–2
8–30
Change 2
8–5
POWER RELAY BOX TO PUMP MOTOR LEAD ASSEMBLY — CONTINUED
b.
Installation
1
Install four new lockwashers (8), four plastic attaching straps (7), four flat washers (6), and four cap screws
(5) on power relay box to pump motor lead assembly.
2
Connect connector (3), wire 104, to power pack pump motor connector (4).
3
Connect connector (1), wire 104, to power relay box assembly (2).
4
3
1
5
7
8
2
1
3
6