TM-9-2350-311-20-2

HOWITZER, MEDIUM, SELF-PROPELLED, 155MM; M109A2, M109A3, M109A4 AND M109A5

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL FOR CAB, ARMAMENT, SIGHTING AND FIRE CONTROL, ELEVATING AND TRAVERSING SYSTEMS AND ASSOCIATED COMPONENTS

DECEMBER 1993

  TM-9-2350-311-20-2 - Page 645 of 828

TM 9–2350–311–20–2
17–7
5
Install adapter (5) in inlet port (6) and adapter (9) in outlet port (10) of M3 electrical air heater (2).
NOTE
•
Lockwashers (13) should be installed between mounting block and M3 electrical air heater.
•
Install a washer and retaining strap with cannoneer no. 1’s M3 electrical air heater. Reinstall a
retaining strap with section chief’s M3 electrical air heater.
6
Install M3 electrical air heater (2) on cab ceiling using four new lockwashers (13), four new lockwashers
(12), and four cap screws (11).
7
Connect hose (8) from orifice connector to outlet port (10) of M3 electrical air heater (2) and hose clamp (7).
8
Connect hose (4) from M2A2 air purifier to the inlet port (6) and tighten hose clamp (3).
9
Plug NBC power lead assembly (1) into M3 electrical air heater (2).
1
6
3
4
8
7
13
12
11
5
9
2
6
10
10
2


Back to Top