10-1 WINTERIZATION KIT INSTALLATION — CONTINUED
a Installation — Continued
10
11
12
13
Place
four batteries on two battery trays with battery terminals positioned as shown below. Secure batteries
using mounting components (TM 9-2350-311-20-1).
Open transmission left and right access doors and air-intake grille. Install four shock mounts (19) and two
coolant heater mounting brackets (20) to hull front plate (21) with four lockwashers (22) and four nuts (23).
Cut 3.5 in. (8.9 cm) out of existing engine inlet coolant hose (24) at point midway between two coolant heater
mounting brackets (20). Discard hose section. Place two clamps (25) over two hose ends, insert “Y” tube (26)
as shown below, and tighten clamps.
Place
hose clamp (27) over end of 0.625-in. - (15.9-mm-) id by 16-in. - (40.6-cm-) long hose (28). Install hose to
"Y" tube (26) and tighten clamp
.