TM 9--2520--215--34
0064 00--7
TORQUE CONVERTER AND RELATED PARTS REPAIR – CONTINUED
0064 00
ASSEMBLY
1. Position pump bearing support, with large diameter shoulder up, on a press bed, with clearance for bearing OD
shoulder to protrude. Position bearing (26) with OD step down, on support (27). Press bearing (26) into support
(27) until OD step face rests on support bore shoulder.
2. Position converter pump (25), vane side up, on a bench. Tap bearing support (27), large diameter shoulder down,
into bore of pump (25). Use a soft mallet.