TM-9-2815-224-34-P

ENGINE, DIESEL:8-CYLINDER TURBOCHARGED, DETROIT DIESEL CORPORATION MODEL 8V92TA

DIRECT SUPPORT AND GENERAL SUPPORT MAINTENACE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

JANUARY 1988

  TM-9-2815-224-34-P - Page 213 of 554

TM9-2815-224-34&P
Valve Mechanism Maintenance Instructions (Cont)
b. Installation.
(1) Press two bushings (1) into camshaft front end
bearing (2) until flush with ends of bearing (2).
(2)
Press two bushings (1) into camshaft rear end bearing (3) until
bushing sticks out approximately 0.045 to 0.055 in. (1.14 to
1.40 mm).
(3)
Install two thrust spacers (4) on rear end bearing (3).
Bore bushing (1) to 1.496 to 1.498 in. (37.998 to 38.049 mm).
(4)
C
. Follow-on Maintenance.
Install camshaft end bearings (para 7-9).
END OF TASK
7-35


Back to Top