TM-9-2910-226-34

PUMP, FUEL, METERING AND DISTRIBUTING, ASSEMBLY

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT, MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS

JUNE 1974

  TM-9-2910-226-34 - Page 101 of 208

TM 9-2910-226-34
Figure 3-83. Installing high speed and idle adjustment screws.
(17) Refer to figure 3-59 and install dust cover
(D), lockwasher (C) and machine bolt (B). Torque
tighten dust cover bolt to 50-60 inch-pounds. Do not
install lead seal safety wire at this time.
(18) Refer to figure 3-84. Insert a feeler gage (A)
to obtain a clearance of 0.002 to 0.004 inch between
the operating lever and dust cover. Loosen clamping
screw (B), lockwasher (C), and nut (D). Move lever
as necessary to obtain this clearance. Torque tighten
nut to 70-75 inch-pounds.
Figure 3-84. Checking operating lever clearance using a feeler gage
NOTE
Sub-paragraph (19) below applies to code A
pumps only.
(19) Refer to (16) above and figure 3-83 and
install idle and high speed adjusting screws. Refer to
figure 3-85. The operating lever and stop lever is one
piece on this pump. Install screw (A), lockwasher (B)
and nut (C). Install operating lever assembly in up
position on operating shaft (D) with the split in lever
alined with scribe mark on end of operating shaft


Back to Top