TM 9-6920-430-14
NOTE
Very small leaks at the following fittings are acceptable:
a. Inlet fitting at upper left side of GPU.
b. Outlet fitting at upper right side of GPU.
c. Inlet port of cross connector.
d. Proof test inlet port.
e. Gas supply bottle adapter.
(50) Close the gas supply valve (41), OUTLET SHUTOFF valve (43), and INLET
SHUTOFF valve (44) fully clockwise. Slowly open the OUTLET BLEED valve (42) two turns
counterclockwise. Tighten the leaking fittings using appropriate size wrenches.
(51) Close the OUTLET BLEED valve (42).
(52) Slowly open the gas supply bottle valve two turns counterclockwise.
(53) Open the OUTLET SHUTOFF valve (43) two turns CCW.
(54) Open the INLET SHUTOFF valve (44) two turns CCW. The INLET PRESSURE
(45) and OUTLET PRESSURE (46) gages and the digital readout device (47) should all read
approximately the same ±200 psi. Perform step 49.
(55) Return to location of control box and perform proof test per steps 31 through 35.
(56) Record date of high proof pressure test in applicable columns of DA Form 2408-9.