TM-9-6920-430-14

COOLANT RECHARGING UNIT, TRAINING GUIDED MISSILE SYSTEM M80 AND CHARGER, BATTERY PP-7309/T

TECHNICAL MANUAL; OPERATOR’S AND ORGANIZATIONAL DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

AUGUST 1980

  TM-9-6920-430-14 - Page 111 of 180

TM 9-6920-430-14
Be sure that personnel are not in line with the gas supply valve outlet when perform-
ing the next step. Escaping gas can damage the eyes and skin, and direct inhalation
of the gas can result in suffocation.
(24) Slowly open the gas supply valve (32) counterclockwise to purge any contaminants
from the adapter (33). Purge for 10 seconds and then close the gas supply valve fully clockwise.
(25) Connect the inlet flexible hose (34) to the gas supply adapter using a 3/4-inch wrench
to hold and a 9/16-inch wrench to tighten.
(26) Wrap the inlet flexible hose safety chain (35) around the neck of the gas supply and
hook the snap into a chain link.
(27)
left and right
(28)
(29)
Connect the safety chains for the inlet and outlet flexible hoses to the eyebolts on the
front sides of the GPU.
Close and secure the access door on the left side of the GPU.
Close the INLET BLEED (36) and INLET SHUTOFF (37) valves fully clockwise.
Change 1
3-51


Back to Top