Table 3-3.
GPU Troubleshooting Guidance Chart (Continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
8. GPU DOES NOT STOP WHEN PRESSURE GAGES INDICATE A MAXIMUM OF
6200 PSIG.
CALIBRATE PRESSURE GAGES AS DESCRIBED IN PROOF TEST PROCEDURE,
PARA. 3-7 (PAGE 3-16) AND 3-8 (PAGE 3-20). IF GAGES ARE PROPERLY
CALIBRATED, THE 6K PSI PRESSURE SWITCH IS OUT OF ADJUSTMENT OR
DEFECTIVE.
ADJUST IN ACCORDANCE WITH PROOF TEST PROCEDURE OR REPLACE
IN ACCORDANCE WITH PARA. 3-22 (PAGE 3-82).
Change 1
3-59