TM-9-6920-430-14

COOLANT RECHARGING UNIT, TRAINING GUIDED MISSILE SYSTEM M80 AND CHARGER, BATTERY PP-7309/T

TECHNICAL MANUAL; OPERATOR’S AND ORGANIZATIONAL DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

AUGUST 1980

  TM-9-6920-430-14 - Page 144 of 180

TM 9-6920-430-14
3-22. PRESSURE SWITCH REPLACEMENT (Figure 3-8)
a.
Remove housing enclosure in accordance with para. 3-18 steps
a
through
c
page 3-76).
b.
Remove cover plate (4) from pressure switch assembly (3) and remove wire lugs from
pressure switch terminals.
c.
Remove connector (6) from conduit box (5) by rotating counterclockwise.
d.
Using a 9/16-inch wrench, loosen gas line coupling (2) until free from T connector (1).
e.
Lift safety switch upward to remove.
f.
Install replacement pressure switch by aligning the switch assembly (3) inlet line with T
connector coupling (2) and secure with a 9/16-wrench.
g.
Secure connector (6) to conduit box (5) by rotating clockwise.
h.
Connect wire lugs to pressure switch terminals and attach cover plate (4).
i.
Purge system as described in para. 3-18h-l through 10 (page 3-76).
j.
Adjust switch in accordance with para. 3-8a step 33 (page 3-39).
k.
Replace housing enclosure in accordance with para. 3-18h step 13 (page 3-78).
3-82
Figure
3-8.
Pressure Switch Replacement
Change 1


Back to Top