MWO-9-2300-378-34-2

TANK, COMBAT FULL-TRACKED

MODIFICATION WORK ORDER

JUNE 1984

  MWO-9-2300-378-34-2 - Page 27 of 92

MWO 9-2300-378-34-2
e. Installation of Manual Shut-off Valve.
(1) Secure valve l1669749 in soft-jawed vise.
(2) Apply teflon tape on 45° elbow MS51817-25, install elbow in valve, and position as
shown in figure 14.
Figure 14. Installation of 45° Elbow in Manual Shut-Off Valve
(3)
(4)
Loosen oil cooler vent line elbow and bolts securing oil cooler vent line clamps
(figure 15).
Remove and discard existing shroud screws (figure 15).
Figure 15. Oil Cooler Vent Line
25


Back to Top