SMI 9-2320-387-14&P-1
Change 4
12-169
FOLLOW-ON TASKS: • Install blackout/dome light door switch (para. 12-112).
• Install blackout/dome light switch (para. 12-111).
• Install cargo floor cover (para. 12-115).
• Connect battery ground cable (para. 4-68).
• Check blackout light and dome light for proper operation (TM 9-2320-387-10).
12-110. TROOP/CARGO WINTERIZATION BLACKOUT/DOME LIGHT WIRING HARNESS
REPLACEMENT (Cont’d)