TB-9-2320-280-35-12

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR EPLRS NETWORK MANAGER VEHICLE WITH AMTECH TOP

OCTOBER 2006
CHANGE 1

  TB-9-2320-280-35-12 - Page 51 of 162

TB 9-2320-280-35-12
5-23
Figure 5-29.
2. DC-DC POWER ADAPTER CABLE
– P/O PA1540-647 – QTY. 1
3. SCREW – MS35207-263 – QTY. 2
4. LOOP CLAMP – 3225T43 – QTY. 3
5. PCMCIA CABLE – A3265957 – QTY. 1
6. ETHERNET CABLE – A3265597 – QTY. 1
7. SCREW – 93195A1113 – QTY. 4
8. NUT – 90675A005 – QTY. 4
9. SCREW – MS51959-15 – QTY. 4
10. CABLE CARRIER – 55835K44 – QTY. 1
11. CABLE CARRIER – 55835K42 – QTY. 1
13. PARALLEL CABLE – P/O A3265640 – QTY. 1
Section XIV.
COMPUTER STAND CABLE INSTALLATION
14-1.
Assemble and install front cable carrier (11) on shelf (1) with two screws (9), nuts (8), and
screws (7).
14-2.
Route Ethernet cable (6) along bottom of shelf (1) to front cable carrier (11).
14-3.
Assemble and install rear cable carrier (10) on shelf (1) with two screws (9), nuts (8), and screws (7).
14-4.
Route PCMCIA cable (5) along bottom of shelf (1) to rear cable carrier (10) and secure
PCMCIA cable (5) to shelf (1) using screw (3) and clamp (4).
14-5.
Route DC-DC cable (2) along bottom of shelf (1) to rear cable carrier (10) and secure DC-DC cable (2)
to shelf (1) using screw (3) and clamp (4).
14-6.
Route Parallel cable (13) along bottom of shelf (1) to rear cable carrier (10) and secure
Parallel cable (13) to shelf (1) using existing screw (12) and clamp (4).
2
3
4
5
6
7
1
~
13
8
9
10
11
12
4


Back to Top