TB 9-2320-280-35-12
5-14
Section VII. PLGR BRACKET INSTALLATION
7-1.
Install PLGR bracket (11) on integrated rack (1) with four screws (12).
7-2.
Locate, mark, and drill one 0.201-in. diameter hole (9) in right-side engine tunnel (10).
7-3.
Remove paint from vicinity of hole (8) on integrated rack (1) and hole (9) on right-side engine
tunnel (10). Apply anti-seize compound as required.
7-4.
Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs.
7-5.
Install ground strap (5) on integrated rack (1) with capscrew (6), two lockwashers (4),
lockwasher (2), and nut (3).
7-6.
Install ground strap (5) on right-side engine tunnel (10) with self-tapping screw (7) and two
lockwashers (4).
Figure 5-19.
~
~
1
2
3
5
6
4
7
8
9
10
11
12
4
4
2. LOCKWASHER – MS35338-44 – QTY. 1
3. NUT – 9419143 – QTY. 1
4. LOCKWASHER – MS45904-68 – QTY. 4
5. GROUND STRAP
• BRAIDED WIRE – AA59569F30T0375 – QTY. A/R
• TERMINAL LUG – MS20659-129 – QTY. 2
6. CAPSCREW – B1821BH025C100N – QTY. 1
7. SELF-TAPPING SCREW – 9426241 – QTY. 1
11. PLGR BRACKET – 986-0645-001 – QTY. 1
12. SCREW – MS35206-263 – QTY. 4