TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 513 of 704

0052-3
Change 1
TB 9-3950-253-13&P
0052
HEMTT STOWAGE ASSEMBLY INSTALLATION – CONTINUED
NOTE
Hand tighten all bolts and nuts on installation. Reposition support brackets during stowage
assembly installation.
1. Install two bolts and nuts removed from stowage box in two holes (Figure 1, Item 4) on frame (Figure 1, Item 1).
2. Remove two bolts (Figure 1, Item 2) and nuts (Figure 1, Item 3) from frame (Figure 1, Item 1).
Figure 1.
Remove and Replace Frame Bolts.
052
4
1
2,3


Back to Top