TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 77 of 704

0007-31
Change 1
TB 9-3950-253-13&P
0007
STOW LIFT FRAME – CONTINUED
12. Install bail bar lock (Figure 43, Item 4), and locking bar (Figure 43, Item 3) on lift frame (Figure 43, Item 1).
13. Install snap pin (Figure 43, Item 2) in locking bar (Figure 43, Item 3).
Figure 43.
Bail Bar Stowed on Lift Frame.
07
NOTE
If required, press DOWN button until hook is clear from bail bar.
If required, use lifting lever to adjust height of lift frame in order to clear hook.
14. Press and hold STOW button (Figure 44, Item 1). As soon as stowage guide (Figure 44, Item 2) stops at its
intermediate position, release button.
Figure 44.
Stowage Guide at Intermediate Position.
07
467-169
1
2


Back to Top