TM-10-5411-205-13

SHELTER, ELECTRICAL EQUIPMENT - 250/G

TECHNICAL MANUAL; OPERATOR’S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL

MAY 1995
CHANGE 2

  TM-10-5411-205-13 - Page 20 of 127

3-5.
TM 10-5411-205-13
Figure 3-1. Lifting and Loading Shelter
NOTE
Some procedures require the addition of dunnage to truck bed or
the attachment of tiedown eyes to truck before loading shelter onto
truck Refer to TM 9-2320-280 for Ml037 and Ml042 trucks and
TM 9-2320-289 for M1028 trucks.
Lower truck tailgate and make sure all tools and equipment have been removed
from truck bed.
Position one person at free end of each rope to guide shelter into place.
Lift shelter to a position high enough to clear truck bed.
Back truck into position under shelter.
All personnel must remain clear of truck while shelter is being low-
ered into place.
With one person at each rope, guide shelter into position so it is aligned above
truck bed, and maintain that position while lowering shelter into place on truck
Change 1
3-3


Back to Top