TM-5-2330-378-14-P

SEMITRAILER, LOWBED: 40 TON CONSTRUCTION EQUIPMENT TRANSPORTER M870 AND M870A1

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

JUNE 1999

  TM-5-2330-378-14-P - Page 202 of 524

TM 5-2330-378-14&P
4-53. SPRINGBRAKECHAMBERREPLACEMENT.
ThisTaskCovers:
a.
Removal
b.
Installation
Initial Setup:
Tools/Test Equipment:
- Lockwasher
(2) (item 15, Appendix 1)
- Tool kit general mechanic's:
automotive
(Item 7, Appendix B)
Equipment Conditions:
- Drain cocks open (pare 3-8).
Materials/Parts:
- Tape, antiseizing (item 21, Appendix F)
a .
REMOVAL
NOTE
There
are four
spring
brake
chambers
on the
front
and
middle
axles.
Thisprocedure
is for the replacement
of one spring brake chamber.
1.
Tag and disconnect two air hoses (1) from two elbows (2) on spring brake chamber (3).
2.
Loosen and position jamnut (4) approximately I inch (2.5 cm) from clevis adapter (5).
3.
Unscrew clevis adapter (5) from clevis (6).
1
4.
Remove two nuts (7) and lockwashers (8) from
spring brake chamber (3) and axle mounting
2
bracket (9). Discard lockwashers.
I
5.
Remove spring brake chamber (3) from axle
mounting bracket (9).
2
1
6.
Remove two elbows (2) and clevis adapter (5)
from spring brake chamber(3).
3
7
8
9
5
4
6
4-114


Back to Top