TM 5-2350-377-14&P
0022 00
APRON AND DOZER ASSEMBLY REPLACEMENT AND REPAIR - continued
d. Install sixteen screws (11), washers (12), and locknuts (13) on dozer cutting edge (6) and dozer blade (7).
e. Tighten locknuts (5), (10), and (13) to 280 lb-ft (379 N m).
Figure 32.
Cutting Edges.
0022 00-15