TM 5-2350-377-14&P
REMOVAL
NOTE
New Production vehicles are equipped with a steel dozer blade which includes a cut-out and
cover at top rear of dozer blade.
Perform step 1 if removing cover.
Steps 1 through 3 apply to Figure 41.
1. Remove two screws (11), washers (12), locknuts (13), and cover (14) from dozer blade (3).
Discard locknuts (13).
2. Remove two screws (1) and washers (2) from dozer blade (3) and two inner pivot pins (4).
3. Using hammer and brass drift, remove two inner pivot pins (4) from dozer blade (3) and apron (5).
Figure 41.
Removal of Inner Pivot Pins from Dozer Blade.
DOZER BLADE REPLACEMENT AND REPAIR
0023 00
0023 00-1
INITIAL SETUP
Tools/Test Equipment
Tool kit, general mechanic's
(Item 6, WP 0056 00)
Shop equipment, common no. 1
(Item 2, WP 0056 00)
Equipment Conditions
Front of vehicle blocked
(TM 5-2350-262-20-1)
Dozer blade folded (WP 0005 00)
Dozer cutting edge removed or dozer blade
extensions removed
(TM 5-2350-262-20-1)
Chain Assembly
(TM 5-2350-262-10)
Personnel Required:
Construction Equipment Repairer 62B10