TM 5-2350-377-14&P
0023 00
APRON BLADE REPLACEMENT AND REPAIR - continued
Figure 45.
Pivot Points.
NOTE
Steps 3 and 4 apply to Figure 46.
3. Coat two outer pivot pins (3) with grease and install dozer blade (1) on apron (2) with outer pivot pins (3).
4. Remove lifting device and chain.
Figure 46.
Installation of Dozer Blade onto Apron.
0023 00-5