TM-5-2350-377-14-P

ARMORED COMBAT EARTHMOVER (ACE), M9

TECHNICAL MANUAL; OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) SUPPORTING THE HYDRAULIC BLADE FOLDER-TRACK TENSIONER (HBF-TT)

  TM-5-2350-377-14-P - Page 153 of 335

TM 5-2350-377-14&P
0023 00
DOZER BLADE REPLACEMENT AND REPAIR - continued
Figure 44.
Assembly of Shackle onto Dozer Blade.
INSTALLATION
NOTE
New Production vehicles are equipped with a steel dozer blade which includes a cut-out and
cover at top rear of dozer blade.
Perform step 1 if installing cover.
Install new bushings on all pivot points of apron and dozer assembly, if installing new dozer
blade.
Steps 1 and 2 apply to Figure 45.
1. Connect chain to dozer blade (1).
Connect lifting device to chain and take up slack.
WARNING
Lifting device must have a weight capacity greater than 585 lb (266 kg).
Ensure dozer blade
is securelyl supported before installing outer pivot pins.
Failure to comply may result in sever
injury to personnel.
Personnel must stand clear during lifting operations.
A swinging or shifting load may result in
injury to personnel.
2. Place dozer blade (1) on supports in front of vehicle, and align pivot points of apron (2) and dozer blade (1).
0023 00-4


Back to Top