TM 5-2350-377-14&P
0022 00
APRON AND DOZER ASSEMBLY REPLACEMENT AND REPAIR - continued
17.
Apron strips.
NOTE
Apply lubricating oil to threads of screws prior to installation.
Steps 17a and 17b apply to Figure 36.
a. Install apron strip (3) on apron and dozer assembly (4) with three washers (2) and self-locking screws (1).
b. Tighten self-locking screws (1) to 39-41 lb-ft (53-56 N m).
Figure 36.
Apron Strips.
18.
Dozer blade.
Refer to WP 0023 00.
0022 00-18