TM 5-2350-377-14&P
0022 00
APRON AND DOZER ASSEMBLY REPLACEMENT AND REPAIR - continued
NOTE
Steps 9 through 11 apply to Figure 31.
9. Coat short threaded end of two studs (18) with sealing compound, and install washer (19) and nut (20) on each stud
(18).
10. Install lift eye shackle (21) on each side of apron (4) with studs (18) from outboard side of bracket.
11. Coat long threaded end of two studs (18) with lubricating oil, and install washer (22) and locknut (23) on each stud
(18).
Tighten locknuts (23) to 83-91 lb-ft (113-123 N m).
Figure 31.
Installation of Studs onto Apron.
NOTE
Refer to the following pages, and install the components and assemblies on the apron and dozer assembly.
12.
Headlight assembly.
Refer to WP 0016 00.
13.
Cutting edges.
NOTE
Coat threads of screws with lubricating oil prior to installation.
Steps 13a through 13e apply to Figure 32.
a. Install dozor extension end bit (1) on dozer extension (2) with four screws (3), washers (4), and locknuts (5).
b. Install dozer cutting edge (6) on dozer blade (7) with screw (8), washer (9), and locknut (10) on each end.
c. Fold dozer blade (7).
0022 00-14