TM 5-3895-372-20
CHAPTER 3
INTEGRATED MAINTENANCE
13-1.
OVERVIEW.
This chapter provides you with the following information related to overall mixer body maintenance.
a
.
All required special tools and equipment.
b
.
Troubleshooting procedures.
c
.
Maintenance procedures.
Section I REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
13-2
COMMON TOOLS AND EQUIPMENT.
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
13-3.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT.
The special tools, TMDE, and support equipment for mixer body integrated maintenance procedures
described in this
chapter are limited to the following item.
(Refer to Organizational Maintenance RPSTL, TM 5-3895372-20P for tool
description and illustration.)
a.
Hydraulic pressure gage, 0-5000 psi (0-34475 kPa).
b.
Air pressure gage, 0-150 psi (0-1000 kPa).
c.
Water pressure gage, 0-75 psi (0500 kPa).
13-4.
SPARES AND REPAIR PARTS.
Spares and repair parts are listed and illustrated in the Repair Parts and Special Tools List covering Organizational
Maintenance for the equipment (TM 5-3895-372-20P).
Section II SERVICE UPON RECEIPT
13-5.
CHECKING UNPACKED EQUIPMENT.
a
.
Inspect the equipment for damage incurred during shipment.
If the equipment has been damaged, report the
damage on DD Form 6, Packaging Improvement Report.
b.
Check the equipment against the packaging slip to see if the shipment is complete.
Report all discrepancies
in accordance with the instructions of DA Pam 738-750.
Change 1
3-1