TM 5-5420-202-20-2
TURBOSUPERCHARGER OIL DRAIN TUBE (LEFT BANK) REPLACEMENT (Sheet 3 of 3)
9.
10.
11.
12.
13.
14.
15.
16.
17.
Position new gasket (J) on flange (K).
Using socket, install two bolts (L) and two washers (M) to secure tube cylinder head oil
drain assembly (D).
Using screwdriver, tighten six clamps (E) to secure hoses (A), (B) and (C).
Replenish engine oil (LO 5-5420-202-12).
Connect powerplant test (ground hop) equipment (page 5-25).
Start engine and check oil drain line assembly for leaks.
Shut down engine.
Disconnect powerplant test (ground hop) equipment (page 5-40).
Install powerplant (page 5-14).
End of Task
6-96