TM-5-5420-202-20-2

M60A1 CHASSIS, TRANSPORTING; FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE MANUAL; VOLUME 2 OF 4

OCTOBER 1985

  TM-5-5420-202-20-2 - Page 160 of 734

TM 5-5420-202-20-2
UPPER OIL FILLER TUBE REPLACEMENT (Sheet 4 of 4)
8.
Place clamp (J) on hose (K) with nut facing
you.
9.
Position tube assembly (F) with its assembled
parts on powerplant.
10.
Push tube assembly (F) into hose (K).
11.
Position clamp (J) over end of hose (K).
12.
13.
14.
15.
16.
17.
18.
19.
Place two lockwashers (L) on two screws (M).
Start two screws (M) through clamps of tube
assembly (F).
Using 1/2 inch socket, tighten two screws
(M).
With clamp (J) positioned over end of hose,
use 5/16 inch wrench and tighten nut of clamp
(J).
Position bracket (N), clamp (P), and two screws
(Q).
Start nuts (R) on screws (Q).
Using 1/2 inch socket and 1/2 inch wrench,
tighten nuts (R).
Install powerplant (page 5-14).
End of Task
6-87


Back to Top